Construction

Arch work

17) The archwork above the door was designed as work proceeded. Note: the firebox door is built into the facing but the oven door is fixed to the core.

17) The archwork above the door was designed as work proceeded. Note: the firebox door is built into the facing but the oven door is fixed to the core.

Bookmark the permalink.

Comments are closed.